On Mon, 2007-10-22 at 14:13 +0000, Scott Kitterman wrote:
> Is there going to be an ability for projects to opt-out or have a
> different expiration window? The one size fits all timeline doesn't
> work everywhere.
That is not planned. It has been discussed. It was felt that this
feature should be released as a general feature for all projects.
Project specific settings such as opting out, and configurable
expiration age should are a separate issue.
On Mon, 2007-10-22 at 14:13 +0000, Scott Kitterman wrote:
> Is there going to be an ability for projects to opt-out or have a
> different expiration window? The one size fits all timeline doesn't
> work everywhere.
That is not planned. It has been discussed. It was felt that this
feature should be released as a general feature for all projects.
Project specific settings such as opting out, and configurable
expiration age should are a separate issue.